Edmonton · Alberta-wideLicence 9919234 · CGL $2M · WCB
Open 9:00–20:00[email protected]
DWG-040.01 · Your project onlineEdmonton · Alberta
  1. Home
  2. Your project online
Client page

Your project online

Every client gets a private page for their project. It shows where things stand, the next date, what we need from you, the payments, your design in 3D and photos from the shop. Open it from any phone, any time.

Sign in
Login + password
Works on
Any phone
Updated
As we work
Cost
Included
DWG-040.02 · What you see
What you see

Four things on one page

Example project with made-up details, not a real client.

Client page, example: project status with the steps measure, design, agreement, final measure, production, installation, complete
Screen 01

Where it stands

The top of your page says what is happening now (for example: your cabinets are being built in our shop), the next date, and a short list of what we need from you, like a faucet model before we drill the countertop. The seven steps run from measure to complete.

Client page, example: the kitchen design in 3D
Screen 02

Your design in 3D

The design you approved, in 3D: drag to turn it, pinch to zoom, look from above or straight at the front, switch the walls off. It is drawn from the same project file our shop works from.

Client page, example: three payments of 30, 40 and 30 percent with the balance
Screen 03

Payments 30 / 40 / 30

Three payments, each tied to a step: 30% on signing, 40% when production is complete, 30% after installation and the walkthrough. The page shows what is paid, what is due and the balance.

Client page, example: photos from the workshop and the site
Screen 04

Photos from the shop

Photos from the shop and the site as your cabinets are cut, assembled and installed. Tap one to see it full size.

DWG-040.03 · Access
Access

How you get your page

  1. 01

    We set it up

    With your project

    Your project page is made from the same project file we design and build from.

  2. 02

    We email your login

    By email

    You get a login and a password by email. Keep the email: the link to your page is in it.

  3. 03

    Open it any time

    Any device

    Sign in at borealkitchens.ca/client on a phone, tablet or computer.

  4. 04

    It moves with the work

    Measure to complete

    The step, the next date, the payments and the photos change as your project goes from measure to install.

DWG-040.04 · FAQ
FAQ

Questions about the client page

01Who can see my project page?+

Only someone with your login and password. To show the design to family, ask us for a separate link that opens only the 3D view.

02Is the 3D view exactly what you build?+

It is drawn from the same project file our shop works from. Before production you also approve the final drawings, as described in how it works.

03Does it cost anything?+

No. It comes with every project.

04I lost my password. What do I do?+

Call or WhatsApp us at +1 (780) 800-5078 or email [email protected] and we send you a new one.

05Are the screens on this page a real client?+

No. They show an example project with made-up details. Your page shows your own project.

DWG-040.05 · Next stepCall-back within 15 minutes, 9:00–20:00
Next step

Start with a price range

Price your project in a minute with a calculator, or send a few details and photos. Once we work together, your project page follows.